Arrow-Up TOP

Zechner / Zechner

View all projects
mobility

Graz Main Station 2020

Graz

The main station of Graz was reorganised and reconfigured as part of the infrastructure project. A new pedestrian tunnel was built consecutive with the rail and platform alterations to connect the western and eastern parts of the city, and the roofing over the platform area will be renewed. The new tunnel “North” is designed with an artwork of Peter Kogler and a length of 150 meters and gives the underpass the flair of an art exhibition. A large roof spans three platforms with a double-arch construction and provides the spacious atmosphere Graz’s main station requires.

Video: youtube

Details

Planning 2009-2014

Completion 2015

In collaboration with PUG and Zivilingenieurbüro Kratzer